
Zero Export
Ladera
6.38 kWp
Reference
REF-LAD-001
Location
Ladera, San José del Cabo
Savings achieved
60%
11 panels · 25 kWh/day
Panels
11
System
6.38 kWp
Daily production
25 kWh
Inverter
Fronius central inverter
Installation2024
Two-phase project: Zero Export and Hybrid with Fortress batteries. Residence in Ladera with savings of up to 85% in phase two.
Project gallery
A similar project for your property?
Tell us your location and consumption. We'll send you a proposal with no obligation.
Request consultation