SOSOCO Logo

Precision Engineering

Solar Energy That Works When You Need It Most

Zero Export Systems and Battery Backup designed for the unique conditions of Los Cabos. The definitive solar solution when CFE denies interconnection permits.

Our Solutions

Four Systems. One Question:
What is Your Scenario?

We optimize each project according to your consumption and grid restrictions. Palmilla, Pedregal, Quivira, Cresta del Mar.

Zero Export
block

Zero Export

Ideal Profile

Don't wait for CFE. Start saving now, without depending on the bidirectional meter.

Main Advantage

Savings from day one. 100% legal, no grid injection.

More Information arrow_forward
Grid-Tied
swap_horiz

Grid-Tied

Ideal Profile

Areas with CFE feasibility. Maximum return on investment.

Main Advantage

Recovery in 2.5–3 years. Net Metering, bill reduced by up to 99%.

More Information arrow_forward
Most Popular
Hybrid + Batteries
battery_charging_full

Hybrid + Batteries

Ideal Profile

Residences that demand 24/7 continuity. Backup for blackouts and hurricanes.

Main Advantage

When the grid fails, your home keeps running. LFP batteries.

More Information arrow_forward
Off-Grid
power

Off-Grid

Ideal Profile

Remote areas without CFE infrastructure. 100% off-grid.

Main Advantage

Fully isolated system. No CFE backup. Ideal for developments without grid.

More Information arrow_forward
Local Context

Why is Los Cabos Different?

Baja California Sur is an "Electric Island". Our grid is isolated and fragile. Understanding this is key to designing systems that work.

public_off

Isolated Grid

The local grid suffers extreme variations. We design systems that stabilize your internal voltage without depending on CFE.

block

Saturated Circuits

If CFE denies interconnection in your area, we implement Zero Export: you generate and consume without touching the grid. 100% legal.

cyclone

Hurricanes

Our hybrid systems with LFP batteries keep your home running for days when the grid collapses after a storm.

savings

DAC Tariff

High consumption tariff is 400% more expensive. We get you out of this tariff immediately, reducing your bill by up to 95%.

Solar installation Los Cabos
Solar project
Solar panels BCS
Residential solar system
Installation

Smart Investment With Guaranteed Return

Solar systems in BCS have one of the fastest returns on investment in Mexico thanks to high radiation and elevated tariffs.

1

Grid-Tied Systems

Recovery in 2.5 to 3 years.

2

Hybrid Systems (Batteries)

Recovery in 4 to 5 years (immediate added value).

3

Tax Benefits

100% deduction (LISR Art. 34) in the first year.

Accumulated Savings Projection

Year 1Initial Return
Year 3 (ROI)Break-Even Point
Year 10Net Gain
Year 30Panel Lifespan

"After year 3, you have over 20 years of practically free energy."

Installations in the most exclusive communities

Palmilla, Pedregal, Quivira, Cresta del Mar. Hurricane and marine certified systems.

View Projects
Engineering for Desert and Sea

The Standard SOSOCO

Designed for the extreme conditions of Baja California Sur: hurricane winds, salinity and exclusive community regulations. Systems that last 30 years.

cyclone

Hurricane Resistance

250 km/h

Marine-grade certified structures. Zero structural damage during Hurricane Norma 2023.

water_drop

Marine Grade

Anti-Corrosion

IEC 61701 panels, hermetic connectors and marine UV wiring. Coastal salinity resistance.

architecture

Aesthetic

Architectural

Integration in Palmilla and Pedregal. Panels invisible from the street, per each development's regulations.

Your Residence Deserves
Energy That Works.

Precision engineering for the unique conditions of Los Cabos. Free technical consultation, no obligation.

verified

Honest Engineering

Real calculations, ROI < 3 years.

Request Your Free Technical Consultation

CFE bill analysis, feasibility and quote with breakdown.

Get Quote

Your data is protected.